While E ripped out wiring, I removed the remaining plaster and lathe from the kitchen walls and ceiling. We loaded as much debris as possible into the dumpster. The top pic is the wall between the kitchen and entrance room. One day it will be open to the front. The second pic shows a similar angle, but also reveals the subfloor where we started tearing out the vinyl stick-on tiles. Luckily, the green marble tiles were afixed on top of white vinyl tiles. Both come up rather easily with a prybar and a little force, but after 2 hours of labor, we were tired and gave it up for the day!
Sunday, February 25, 2007
Kitchen coming along
While E ripped out wiring, I removed the remaining plaster and lathe from the kitchen walls and ceiling. We loaded as much debris as possible into the dumpster. The top pic is the wall between the kitchen and entrance room. One day it will be open to the front. The second pic shows a similar angle, but also reveals the subfloor where we started tearing out the vinyl stick-on tiles. Luckily, the green marble tiles were afixed on top of white vinyl tiles. Both come up rather easily with a prybar and a little force, but after 2 hours of labor, we were tired and gave it up for the day!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment